CASE STUDY // GENERATIONAL INFRASTRUCTURE

Beyond Devices: Designing a Connected Experience

Why great automation is not about individual products, but about how every element works together as one seamless experience through decentralized open-bus architecture.

Location Mayfair, London
Property Type Grade II Listed Georgian Townhouse
Project Area 8,800 sq. ft.
Completion Autumn 2025
30+ Year Lifecycle Decentralized KNX TP1 Bus

01. Project Overview

Spanning six levels of a Grade II listed Georgian townhouse in Mayfair, London, this 8,800 sq. ft. family residence required an automation standard that would outlast technological fads.

Proprietary cloud gadgets become obsolete within 3 to 5 years when venture-backed servers shut down. For a generational family estate, the electrical infrastructure needed to be designed with a 30-year operational horizon.

01. Project Overview

02. The Generational Standard

We standardized on KNX (ISO/IEC 14543-3)—the only open, vendor-independent standard supported by over 500 manufacturers globally. By centralizing all actuators in basement steel enclosures, any component can be upgraded 20 years from now without ripping open historical horsehair-plaster walls.

A house of this stature cannot rely on consumer gadgets that require software subscriptions. It demands the same permanence as the Portland stone facade.

— Lord Arthur Kensington, Homeowner
02. The Generational Standard

03. Subsystems Orchestration

04. Engineering Verification

30+ Yrs%

Standard Lifecycle

142%

Bus Circuits

24 Zones%

Precision Climate

0 ms%

Cloud Delay

START YOUR PROJECT

Ready to Elevate Your Living Space?

Schedule an architectural smart-home consultation with our engineering team.